SAUDI ARABIA | OIL & GAS WORKFORCE CAMP

Saudi Arabia Dormitory Project

Explore an indicative 1,000-person oil and gas workforce camp configuration in Saudi Arabia, including modular dormitories, dining facilities, medical support, utilities and camp infrastructure.

Illustrative planning scenario. Quantities are design allowances, not verified as-built project records.
Modular worker accommodation camp reference for oil and gas project planning
1,000 Planned Residents
580 Accommodation Rooms
20 Dormitory Blocks
500 Dining Seats

OIL & GAS CAMP REFERENCE

Modular Accommodation for a Large Oil and Gas Workforce

This reference configuration has been prepared around the accommodation needs of a 1,000-person oil and gas construction workforce in Saudi Arabia.

The camp is divided into accommodation zones for general workers, technicians, engineers and management personnel. Each group is assigned a room occupancy standard before the number of dormitory buildings is calculated.

Central facilities include a kitchen and dining complex, laundry, medical room, recreation spaces, administration, prayer facilities and utility service areas.

The configuration provides a basis for preliminary layout discussion and budget development. Final building sizes and specifications depend on the owner's accommodation standards and site requirements.

Reference Country Saudi Arabia
Project Application Oil & Gas EPC Construction Workforce Camp
Planned Capacity 1,000 residents across four personnel categories
Building Approach Modular dormitory blocks with separate support buildings
Accommodation Standard Twin rooms for workers and technicians; single rooms for engineers and managers
Indicative Site Area 50,000–65,000 m², subject to site planning

WORKFORCE DISTRIBUTION

Accommodation Breakdown for 1,000 Residents

A large oil and gas camp commonly needs different room arrangements for the workforce and technical staff. This example uses twin occupancy for general workers and technicians, with single rooms for engineers and management personnel.

Personnel Category Residents Occupancy Rooms Dormitory Blocks
General Workers 600 2 persons / room 300 10 blocks × 30 rooms
Technicians / Supervisors 240 2 persons / room 120 4 blocks × 30 rooms
Engineers 120 1 person / room 120 4 blocks × 30 rooms
Management Staff 40 1 person / room 40 2 blocks × 20 rooms
Total 1,000 Mixed occupancy 580 20 blocks
Room quantity is not the same as container quantity

The 580-room figure represents accommodation rooms. The number of flat pack container modules depends on the final floor plan, room dimensions, bathroom arrangement, corridors, stairs and structural layout.

ROOM CONFIGURATION

Dormitory Room Standards

The following room sizes are preliminary gross-area allowances for the reference layout. Furniture positions, bathroom dimensions, usable room area and circulation clearances must be checked during detailed design.

300 Rooms

General Workers

Twin accommodation with two beds, individual storage and a private bathroom allowance.

120 Rooms

Technical Staff

Twin rooms for technicians and supervisors, with wardrobe, bathroom and worktable options.

120 Rooms

Engineers

Single occupancy with sleeping space, private bathroom, desk and storage.

40 Rooms

Management

Larger single rooms with a private bathroom and additional working or seating space.

Accommodation Group Rooms Indicative Gross Room Area Calculated Room Area
General Workers 300 18 m² / room 5,400 m²
Technicians / Supervisors 120 18 m² / room 2,160 m²
Engineers 120 18 m² / room 2,160 m²
Management 40 24 m² / room 960 m²
Total Sleeping Room Area 580 Before additional circulation 10,680 m²

The 18 m² room allowance is a concept planning figure, approximately corresponding to a 3 × 6 m module footprint. Gross room dimensions do not establish code-compliant usable sleeping area. Final room plans require review against occupancy, sanitary and fire-safety requirements.

MODULAR ACCOMMODATION GALLERY

Building, Interior and Camp Layout References

The images illustrate modular accommodation buildings, sleeping-room arrangements and camp layouts that can inform a large workforce accommodation design.

Gallery images are accommodation references and are not presented as evidence that the 1,000-person example has been constructed.

CAMP MASTER PLANNING

Recommended Camp Functional Zones

A large oil and gas workforce camp requires more than dormitory buildings. The site should be divided into residential, communal, administrative and utility zones with controlled access and clear circulation.

Zone A — Worker Accommodation

General workforce dormitories, organized into repeated blocks with access to common facilities.

Zone B — Technical Accommodation

Technician and supervisor dormitories with controlled access and suitable room arrangements.

Zone C — Engineering & Management

Single-occupancy accommodation located away from major service and vehicle traffic.

Zone D — Dining & Recreation

Dining hall, kitchen, recreation spaces, prayer facilities and communal amenities.

Zone E — Administration & Medical

Camp administration, reception, security control and medical support.

Zone F — Utilities & Logistics

Power distribution, water treatment, wastewater services, maintenance and general storage.

CAMP SUPPORT FACILITIES

Indicative Facilities and Building Areas

The following allowances give an initial understanding of the support buildings required for a 1,000-person workforce camp.

Facility Planning Reference Indicative Area
Dining Hall 500 seats, two planned sittings 800 m²
Kitchen & Food Storage Food preparation, cold/dry storage and washing 450 m²
Laundry Centralized laundry and linen services 250 m²
Medical Clinic First aid, consultation and treatment rooms 180 m²
Recreation Indoor leisure and common areas 350 m²
Prayer Facilities Prayer rooms and associated spaces 250 m²
Administration & Security Camp management, reception and guard facilities 250 m²
General Storage Supplies, PPE and maintenance storage 250 m²
Utility / MEP Rooms Equipment and service areas 500 m²
Total Support Facilities Indicative gross floor areas 3,280 m²
Dining capacity reference

A 500-seat dining hall could serve 1,000 residents through two separate sittings, provided meal scheduling allows this. Kitchen production capacity and peak mealtime demand require separate review.

PRELIMINARY AREA SCHEDULE

Estimated Building Area and Site Requirement

The accommodation rooms and shared facilities can be combined into an initial area schedule for master-plan and budget discussions.

Area Component Calculation Basis Indicative Area
Accommodation Rooms 540 × 18 m² + 40 × 24 m² 10,680 m²
Accommodation Circulation 20% allowance on room area 2,136 m²
Support Facilities Kitchen, dining, medical, laundry, utilities and other spaces 3,280 m²
Preliminary Total Gross Floor Area Before detailed design adjustments 16,096 m²
Indicative Land Area Residential buildings, circulation, roads and external areas 50,000–65,000 m²

Land and floor-area figures are concept-level estimates. Site circulation, parking, separation distances, fire access, outdoor equipment, wastewater treatment, landscaping and future expansion may change the final area.

HOT-CLIMATE ENGINEERING

Technical Considerations for Saudi Oil & Gas Camps

Saudi Arabia camp projects require careful review of cooling demand, building insulation, electrical distribution and site utilities.

Final specifications must follow the project location, owner requirements, applicable codes and engineering calculations.

Wall Insulation Select wall panel composition and thickness according to thermal requirements.
Roof System Insulated roof assembly with attention to solar heat gain and waterproofing.
Air Conditioning Cooling load and equipment selection based on actual room and climate data.
Windows & Glazing Glazing and shading selected according to energy and occupant comfort requirements.
Electrical Distribution Lighting, outlets, kitchen equipment, HVAC and emergency loads coordinated.
Fire & Life Safety Exits, access, alarms, fire protection and emergency arrangements reviewed by designers.

CAMP INFRASTRUCTURE

Water, Wastewater and Utility Planning

Utilities must be sized alongside the accommodation and catering facilities. The following figures are preliminary planning allowances, not final utility design capacities.

Utility Item Reference Assumption Initial Planning Result
Residents Full planned occupancy 1,000 people
Domestic Water 120–180 litres per person per day 120–180 m³/day
Wastewater 80–90% of the illustrative domestic-water allowance 96–162 m³/day
Power Supply HVAC, kitchen, lighting, laundry, pumps and other loads To be calculated from equipment schedule
Backup Power Critical functions defined by operator requirements Separate emergency-load assessment
Fire Water Applicable fire strategy and authority requirements Separate calculation required
Water Storage Consumption, delivery reliability and required reserve To be confirmed
Wastewater Treatment Actual wastewater generation and discharge standards To be confirmed
Engineering note

These allowances support early discussions only. Water use varies with laundry arrangements, catering and operating practices. Final water treatment, wastewater, storage and electrical systems require an approved engineering design.

OIL & GAS CAMP OPERATIONS

HSE and Camp Operating Requirements

Accommodation facilities serving an oil and gas construction workforce require coordinated site management and safety planning.

Controlled Entry

A defined entry gate and security arrangement for residents, visitors and deliveries.

Pedestrian & Vehicle Routes

Separate daily pedestrian movement from service and logistics traffic wherever practicable.

Emergency Assembly

Assembly areas and evacuation routes based on the approved fire and emergency plan.

Medical Support

Medical facilities and emergency response provisions suitable for the project workforce.

Hygiene & Housekeeping

Planned cleaning, waste handling, food safety and sanitary maintenance arrangements.

Equipment & Maintenance

Safe access to HVAC, electrical, water and wastewater systems for routine maintenance.

All HSE arrangements, occupancy standards and site infrastructure require review against the specific project contract, applicable Saudi requirements and the operator's technical specifications.

NEED AN OIL & GAS CAMP PROPOSAL?

Send Your Workforce Schedule and Site Plan

Hongtai can review accommodation modules, staff categories, camp functions and preliminary quantity requirements.

PROCUREMENT & QUOTATION

Information Needed for a Camp Quotation

Once the accommodation quantity is established, the next step is to confirm the building specification and procurement scope.

Information Required Purpose
Project Location Climate, destination and site conditions
Total Workforce Peak planned accommodation capacity
Personnel Breakdown Workers, technicians, engineers and management
Room Occupancy Single, twin or another approved room standard
Bathroom Configuration Private, shared or centralized sanitary arrangements
Camp Facilities Dining, kitchen, medical, laundry, prayer and recreation
Building Configuration Single-storey, two-storey or mixed building layout
Technical Specification Structure, insulation, electrical, HVAC and fire-safety scope
Utility Scope Water, wastewater, power and other infrastructure
Site Layout / BOQ Detailed quantity take-off and quotation preparation
Destination & Delivery Terms EXW, FOB, CFR or CIF quotation basis as applicable

PROJECT DEVELOPMENT

From Camp Requirements to Modular Building Supply

01

Workforce Schedule

Confirm personnel categories, room standards and planned capacity.

02

Camp Master Plan

Review accommodation blocks, circulation and support facilities.

03

Technical Review

Confirm structural, architectural, MEP and project specifications.

04

Production & Packing

Manufacture and pack the approved modular building components.

05

Export Delivery

Coordinate documentation, transport and supply scope.

RELATED PRODUCTS & SOLUTIONS

Modular Building Systems for Workforce Camps

OIL & GAS CAMP FAQ

Saudi Arabia Workforce Camp Questions

How many rooms are included in this 1,000-person camp reference?

The illustrative schedule includes 580 rooms: 300 general worker rooms, 120 technician rooms, 120 engineer rooms and 40 management rooms. These are concept quantities rather than verified delivered-project figures.

Why are twin rooms and single rooms used?

The example separates the workforce into four categories. Twin rooms are allocated to general workers and technicians, while engineers and management use single rooms. Actual occupancy must follow the project owner's requirements.

Can the accommodation blocks use flat pack container houses?

Flat pack container houses can be considered for repeated dormitory rooms. The number of modules required depends on room dimensions, bathrooms, corridor design and building configuration. Other prefab or modular systems may be used for larger support buildings.

Can Hongtai provide dining, laundry and office buildings?

Hongtai can review modular and prefabricated building requirements for dining, kitchen, laundry, offices, storage and other camp support facilities. The final supply scope should be agreed during quotation.

Is this configuration approved for a Saudi Aramco project?

No project-specific approval is claimed. This is an illustrative planning configuration. Applicable owner specifications, local regulations, occupancy rules, fire safety and technical requirements must be reviewed before a design is submitted for approval.

What is required for an accurate camp quotation?

Provide the camp location, workforce schedule, room occupancy, required facilities, architectural or master-plan drawings, technical specification, BOQ if available and delivery destination.

OIL & GAS CAMP PROCUREMENT

Planning a Large Workforce Camp?

Whether your project needs accommodation for 200, 500, 1,000 or more personnel, Hongtai can review the required modular buildings and project configuration.

Share your workforce schedule, layout, building requirements and destination for an initial quotation review.

  • Project country and location
  • Total workforce and staff categories
  • Required room occupancy
  • Dormitory and sanitary specifications
  • Dining, medical, laundry and office requirements
  • Structural, insulation and MEP specifications
  • Project layout, drawings or BOQ
  • Delivery destination and project schedule
Request a Modular Camp Proposal

Send the main project information. We can discuss an initial accommodation schedule, building system and supply scope for your camp.

+0086-136 4791 3643 ☎︎ Phone sales@prefabhouseglobal.com ✉︎ Email WhatsApp: +0086-136 4791 3643 W WhatsApp