Hongtai Container House / Technical Knowledge

Technical Resource Center

Hongtai Container House is a prefab building manufacturer based in Suzhou, China. Explore our technical guides for container houses, prefabricated buildings, worker accommodation, site offices and complete modular camps.

Technical Guides & Drawings6 TopicsExport Project Support
Hongtai Shanghai Qingpu modular camp project, worker accommodation and site offices

Project reference / Shanghai

From building components
to complete camp projects.
View Qingpu project

Actual project reference. Planning materials elsewhere on this page may be illustrative.

PUBLISHED BY THE MANUFACTURER

Hongtai Container House

Suzhou, Jiangsu, China

Hongtai Container House manufactures container houses, prefab houses and modular building systems for overseas project sites. We work with contractors and procurement teams on worker dormitories, construction site offices, labor camps and supporting facilities.

Our resources cover product specifications, preliminary CAD and camp layouts, assembly guidance, BOQ planning, export packing and shipment inspection. Final engineering, quantities and delivery scope are confirmed for each project.

02 / LIBRARY

Technical guides, all in one place.

Search by topic or choose a category. This directory includes existing Hongtai guides and can add further published technical articles from the WordPress library.

Showing 19 of 19 curated resources

01Technical guideHow to Plan Worker Accommodation for 100, 200 or 300 WorkersPlanning / Workforce↗ 02Technical guideWorker Dormitory Layout: General Workers vs Management StaffPlanning / Dormitories↗ 03Technical guideHow Many Rooms Do You Need for 100 Workers?Planning / Capacity↗ 04Technical guideLabor Camp Layout Guide: Dormitory, Office, Dining and Sanitary FacilitiesPlanning / Complete camps↗ 05Technical guide50mm vs 75mm vs 100mm Wall Panels for Container HousesMaterials / Insulation↗ 06Technical guideWorker Accommodation for Cold Climates: Insulation GuideMaterials / Climate↗ 07Technical guideFlat Pack Container House Specifications: What Buyers Should CheckSpecifications / Flat pack↗ 08Technical guideHow to Calculate Container House Shipping CostShipping / Freight↗ 09Technical guideConstruction Site Office Layout Guide for Small and Large Project TeamsPlanning / Site offices↗ 10Technical guideHow to Choose a Modular Camp Supplier in ChinaBuying / Supplier selection↗ 11Technical guideWhat's Included in a Container House Kit?Product / Material list↗ 12Technical guideHow to Install a Quick-Assembly Container HouseAssembly / Video guide↗ 13Technical guideContainer House Pre-Shipment Inspection ChecklistQuality / Pre-shipment↗ 14Technical guideModular Camp BOQ Example: What Should Be Included?BOQ / Camp procurement↗ 15Technical guideWorker Camp Bathroom and Shower Block Planning GuidePlanning / Sanitary facilities↗ 16Core ConceptsWhat Is a Modular Building?Understand prefabricated modules, combined buildings and common applications for overseas project sites.↗ 17Core ConceptsWhat Is a Prefab House?Learn how factory-prepared building components and different prefabricated systems are used on site.↗ 18Core ConceptsWhat Is a Container House?Learn about modular steel-frame container houses and their use in offices, accommodation and temporary facilities.↗ 19Camp ConceptsWhat Is a Labor Camp Solution?Overview of dormitories, offices, dining, sanitation and shared facilities within a construction camp.↗
View the full Hongtai blog archive ↗Additional relevant posts appear here automatically when the public WordPress article feed is available.
Quick-assembly container house installation animation video preview
03 / WATCH

See how the system comes together.

A 2-minute, 34-second quick-assembly installation animation, from steel members to wall and roof components.

Watch the installation animation ↗

Video opens on YouTube to avoid embedded-player login challenges. Follow model-specific approved drawings for actual installation.

04 / ENGINEERING SUPPORT

Working with drawings and quantities.

Technical documents and preliminary design support are matched to the building system and project requirements.

START WITH A PROJECT BRIEF

No drawings yet? Start here.

Share the site size, expected workforce and required buildings. We can help prepare preliminary camp CAD layouts, 3D views and a structured BOQ.

Discuss project planning ↗
01 / PDF

Product Datasheets

Frame specification, panel materials, floors, doors and windows by selected model.

Request specifications ↗
02 / CAD

Dormitory Layouts

Single, twin and four-person layouts, including one- or two-storey concepts.

Discuss CAD layouts ↗
03 / BOQ

Camp Quantity Schedule

Separate shell structures, sanitary blocks, fit-out, logistics and site works.

Request BOQ assistance ↗
04 / 3D

Concept Renderings

Preliminary building and site visualizations for layout review and discussion.

Discuss 3D planning ↗

Files and design scopes depend on the project. No unverified documents are advertised as available downloads. Preliminary layouts are subject to engineering review.

05 / PROJECT ENQUIRIES

Ready to develop the next camp?

Send your country, workforce, room requirements, site information and any existing BOQ or drawings. We can review the building configuration and supply scope.

Discuss your project ↗
+0086-136 4791 3643 ☎︎ Phone sales@prefabhouseglobal.com ✉︎ Email WhatsApp: +0086-136 4791 3643 W WhatsApp